Design & Detail Engineering |
|
|
Fabrication |
|
|
Installation / HookUp |
|
|
Modifications of Existing Facilities |
|
|
|
 |
Design & Detail Engineering |
| |
 |
JRMEHL
: Pre Engineering
survey for 27 platforms modification under N11/N12
project.
|
| |
 |
ONGCL : Design and
detail engineering including process design for
20000 NM3 / HR fuel gas conditioning skids at SHP /
SHQ platforms in Bombay High – India
|
| |
 |
Samsung Heavy
Industries – Korea : Modification to 4 platforms
under BE project.
|
| |
 |
National Petroleum
Construction Company : Modifications to HA - HE
platforms under HQRST-F project.
|
| |
 |
National Petroleum
Construction Company : Modifications to existing
facilities on 13 platforms under SHG project.
|
|
 |
ETPM
- France : HRA
platform & URAN Terminal Modification under HUT
Project.
|
|
 |
OTP/SOFRESID
- France:
Modification to 11 platforms under WIPPM project.
|
| |
 |
Hyundai Heavy
Industries - Korea : Electrical & Instrumentation
for modification to 2 platforms under SBHT project.
|
|
|
back
to top |
|
|
|
 |
Fabrication |
| |
 |
Hyundai
Heavy Industries CO. Ltd. - S.KOREA : Fabrication for
existing facilities at BCP-A, SHP, SHG, ICP, NQP& MNW
Platforms and Fabrication of Riser Clamps for period of Aug'
04 - Mar'05 under MUT - PL Project.
|
| |
 |
Hyundai Heavy Industries CO.
Ltd.
- S.KOREA : Pre-Fabrication of Piping
Spools / Structural Deck Extensions for Topside
Modifications for seven Platforms for period of
Aug'03 - Feb'04 under MHB - PL Projects.
|
| |
 |
JRMEHL: Fabrication of pipe spools, pipe supports,
deck extensions and associated modifications of
existing facilities on 18 platforms.
|
| |
 |
ONGCL: Fabrication of
7 pressure vessels and 2 skids for 20000 NM3 / HR
fuel gas conditioning skids.
|
| |
 |
Hyundai
Heavy Industries Co. Ltd.
: Fabrication
of 491 nos. of riser clamps from 4” to 12” riser
size and fabrication of about 500 spools for water
injection projects under bonded warehouse.
|
| |
 |
Mazgaon Dock Ltd. :
Fabrication of about 3500 spools or 25000 inch dia
of carbon steel, stainless steel, copper nickel,
copper, spools for BHN RP Project.
|
| |
 |
National Petroleum
Construction Company : Modifications to existing
facilities on 13 platforms under SHG project.
|
| |
 |
ASIAN MARINE
CONTRACTORS : Fabrication of 26” and 30” pipe spools
for NF riser replacement projects.
|
| |
 |
Essar Oil Ltd :
Pre-fabrication of piping spools involving about
3000 inch dia of Incoloy/DSS/Cu- Ni/CS-NACE/CS
piping & pipe supports under Custom Bond.
|
|
|
back
to top |
|
|
|
 |
Installation / HookUp |
| |
 |
Saipem S.p.A - Italy : Hook - Up of one
Well-cum-Process Platform, Living Quarter, Flare
Deck for Saipem S.p.A. (Italy) in Bahr - Essalam
Field - Libyan Offshore for period of June'04 to
Nov'05 (Ongoing) under Sabratha Platform
Project.
|
| |
 |
Hyundai
Heavy Industries CO. Ltd. - S.KOREA : Hook - Up, Pre -
Commissioning, Commissioning of new MSP PLatforms for period
of Dec'04 - May'05 under MSP Project.
|
| |
 |
Cairn Energy India Pty. Ltd. - Hook - Up
of new 4 legged well Platform GA & Modifications of existing
facilities at "LA" Platform for
period of Dec'03 - Mar'04 under GA HookUp
Project.
|
| |
 |
Hyundai Heavy Industries Co.
Ltd.
: Hook-up of 4 Compressor Modules, 3
Living Quarters, 3 Well Head Platforms, 3 Flare
Decks, 1 Water Injection Platform (14 modules) and 6
Interconnecting Bridges at Al Shaheen Field for
Maersk Oil Qatar A/S under Block 5 Development
Project.
|
| |
 |
JRMEHL
: Hookup & commissioning of new N11/N12 well head
platforms & top side modifications for 18 platforms in
north field Bombay High India.
|
| |
 |
Larsen &
Toubro Ltd. - India : Installation of
additional compressor module at HRC platform and its
integration with the existing system.
|
| |
 |
Mazgaon Dock Ltd. :
Replacement of 800 tons 72 men Living Quarters by
new 1300 tons 104 men
Living Quarters at Bombay High Offshore (for the first
time in India existing LQ was replaced at Offshore).
|
| |
 |
J. Ray McDermott Dubai
: Riser Tie in at 8 locations under 4 pipe lines
replacement project.
|
| |
 |
Clough Offshore – Australia : Supply of Skilled
manpower for pipe laying and platform hook-up for GS
15 and GS 23 marginal field development project.
|
| |
 |
Subtec Middle East
– Sharjah : Clamp on conductor project for clamp on
wells on HB, HD, HE platforms.
|
| |
 |
Subtec Middle East –
Sharjah : Clamp on conductor project for clamp on
wells on 7 platforms in Bombay High North field.
|
| |
 |
Command
Petroleum
- India : Piping Installation,
Welding work under Ravva Field Onshore Terminal
Project.
|
| |
 |
Offshore Pipeline
Industries - USA : Assistance by supplying skilled
Manpower on OPI Barge during Jacket Installation for
L II & L III project.
|
| |
 |
Offshore Hyundai
Industries - Korea : Assistance by supplying skilled
Manpower on OHI Barge during Pipe Laying for SBHT
project.
|
| |
 |
Saipem - Italy : Assistance by supplying skilled
Manpower for Riser Installation works during BE
project.
|
|
|
back
to top |
|
|
|
 |
Modifications of Existing Facilities |
| |
 |
Hyundai Heavy Industries CO.
Ltd.
- S.KOREA : Modification for existing
facilities at BCP-A, SHP, SHG, ICP, NQP& MNW
Platforms and Fabrication of Riser Clamps for the
period of Oct'04 - Current under MUT - PL
Project.
|
| |
 |
Hyundai
Heavy Industries CO. Ltd. - S.KOREA : Topside
Modifications Piping & Deck Extensions at seven Platforms,
Execution of works at offshore & Risher Tie - ins at 14
locations for the period of Nov'03 - May'04 under
MHB - PL Projects.
|
| |
 |
Hyundai
Heavy Industries Co. Ltd.
: Hook-up of 4
Compressor Modules, 3 Living Quarters, 3 Well Head
Platforms, 3 Flare Decks, 1 Water Injection Platform (14 modules) and 6
Interconnecting Bridges at Al Shaheen Field for
Maersk Oil Qatar A/S under Block 5 Development
Project.
|
| |
 |
JRMEHL
: Hookup & commissioning of N11/N12 well head
platform & top side modification of 18 platforms in
north field & hook-up of two new platforms
|
| |
 |
Mazgaon Dock Ltd. :
Replacement of 800 tons 72 men living quarter by new
1300 tons 104 men living quarter at Bombay High
Offshore for the first time in India.
|
| |
 |
Hyundai
Heavy Industries
: WIPRP I Project modification of existing
facilities at 13 platform in Bombay High North /
South and Heera Fields. |
| |
 |
Kvaerner Energy Ltd.– UK : Revamping of 3 x LM 2500 TG at SLQ
platforms.
|
| |
 |
Hyundai
Heavy Industries Co. Ltd.
– Korea :
Hook-up of topside facilitie for LA / LB platforms.
|
| |
 |
Brown & Root Energy
Services.
– Singapore : Replacment of top
side piping for 30” oil and 26” gas riser at NF.
|
| |
 |
Hyundai Heavy Industries Co.
Ltd.
– Korea : Modifications at BPB, BLQ
II and hook-up of BCP-B Platform.
|
| |
 |
Larsen & Toubro Ltd.
– India
: Modifications of existing facilities at HA, HRA,
HRG, WIH platforms and hook-up of new HRC platform.
|
| |
 |
Subtec Middle East
– Sharjah : Clamp on conductor project for
clamp on wells on HB,
HD,
HE platforms.
|
| |
 |
Subtec Middle East –
Sharjah : Clamp on conductor project for clamp on
wells on 7 platforms in Bombay High North field.
|
| |
 |
Mazgaon Dock Ltd. –
India : Hook-up of 9 slotted well heads HX and HY in
Heera field.
|
|
|
back